The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Añadir el artículo a carro de la compra
Agregar todos los artículos seleccionados a la cesta de la compra
Eliminar el artículo de la cesta de la compra
Lista de vigilancia
Lista de vigilancia
Artículo no en stock Posible pedido anticipado
Artículo en low cantidad en stock
Artículo en suficiente cantidad en stock
Artículo en entrada
El artículo está incluido en una acción en curso
hacia arriba
Login to the online shop
Log in with your access data in the DESOI online shop. Please use your e-mail address and your password.
If you have forgotten your password, please click here.